12 Ton Natural Gas Steam Boiler

12 Ton Natural Gas Steam Boiler

Fuel gas control step and the blowing process air volume of the total fuel gas 12 ton steam boiler steam boiler is achieved by adjusting a liquid coupling scoop blower. Organization fuel gas steam boiler combustion, is to make a, air pressure, air flow of secondary air with the good. Adjusting the amount of primary air should meet it carries the fuel into the furnace ignition of volatile oxygen required, and to maintain a certain speed, and without clogging the fuel discharge pipe of the jet having a certain rigidity. Primary air volume is too large and too small, the wind speed is too high and too low, should be avoided. In addition to adjusting the secondary air of combustion of the fuel should ensure that the oxygen demand, but must maintain a certain wind speed and primary air is mixed with the master time should have a strong stirring and mixing coke penetrate "the Gray" kinetic , which requires the case may be, each layer of the secondary air flow rate, in order to achieve stable combustion and flue gas excess oxygen appropriate destination. Fuel gas steam boiler, secondary air with what is better? Primary air volume air volume of the total share is called the primary air rate. A small air fraction, pulverized coal is heated to at least the heat required for the ignition point, fire faster, but the amount of primary air to satisfy the principle of combustion of volatiles. Secondary air mixed with the primary air time to the right. If it is mixed before ignition, means an increase in the amount of primary air, so that the ignition delay; hypoxia combustion secondary air if mixed will make late after ignition; if secondary air is mixed all at one position, since the secondary air temperature well below flame temperature, the flame temperature decreases, the combustion slows down, causing the fire. Therefore, the secondary air mixed with fuel should be based on the nature of the combustion zone as required timely sent, so that the combustion of oxygen, and will not reduce the flame temperature to ensure complete combustion and ignition stability. One or two wind speed with what is better? Fuel gas steam boiler once the wind speed is high, the fuel gas stream will catch fire in places far away from the burner, the ignition point postponed; once the wind speed is too low, it will cause a blocked ducts, and ignition point is too far forward, the burner will burn , but also easy to coke near the burner.

Steam boilers What is the function? Too many in the form of 12 ton steam boilers, would like to give a quick four tons of ordinary steam boiler talk. Water in the steam drum is heated to become vapor, fire emits heat in the furnace, it is the principle of the steam boiler. Let me say a boiler pot. This boiler is a boiler drum with a water cooling wall at about the subregional arrangements drum pyrotechnic two return pipe, before the folded portion of the drum front smoke box. Between the drum and the tank in connection with the downcomer tubes and water-cooled bi, constituting the frame of the combustion chamber. There upper steam separator drum to reduce the water vapor out of the tape. Pan heating surface of a lower portion of the drum, and the water cooling pipe bi pyrotechnic tube. A chain grate combustion section and drive means, coupled with the combustion chamber pan rack on the frame configuration composed of the grate. Four weeks envelope refractories. . From coal fired into the hopper, the shutter coal front portion while sealing air control seam thickness. Blast into the lower part of the combustion chamber is a place that boiler greater resistance, need to force the blast. Cinder burn out, through the grate in the rear portion of the olecranon iron discharged from the machine to send out of the furnace slag. The boiler flue gas from the rear, by the front drum smoke tube a return line, the return from the two rear return smoke tube, and then into the dust separating ashes, and then discharged through the chimney draft fan. Not only is the induced draft fan exhaust fumes, the negative pressure of the boiler operation is required. Steam boiler pressure vessels, safety devices is necessary. Boiler necessary water level gauge, pressure gauge, safety valve, thermometer, and under the pressure of the electric pump can pay, and the vapor pump when power is off can also be used. Boiler water must be softened, as well as water treatment equipment.

In recent years, Hebei Province People's Government to respond positively to Blue Sky Battle action plan promulgated by the state, and all of 35t / h coal-fired boiler and below in the Hebei province out of the transformation process. First Hospital of Baoding respond positively to the call of the provincial government, eliminate serious pollution of the original coal-fired boiler hospital, citing energy saving 12 ton steam boiler to natural gas as raw material. After a series of market research, WNS Series Split hospital condensing gas boiler boiler other fast soft spot.

How do I care after the 12 ton steam boiler shutdown method Recently, many users did not know how to call maintenance shutdown after steam boilers, boiler maintenance is very simple in fact, today we explain the steam boiler and hot water boiler after shutdown maintenance. Since the cause of boiler failure or power shutdown required boiler, a steam boiler before travel should stop combustion boiler, the boiler slowly lowering the temperature until no pressure boiler, should pump before shutdown, induced draft fan and turn off the blower. After the maintenance shutdown home for boiler, furnace divided into external corrosion and home for the pot. Pot corrosion enjoying, enjoying their home for two kinds of wet and dry selected based on the length of shutdown time. When long-term disabled boiler, furnace should be paid close attention to external corrosion problems take care of themselves. First, the boiler shutdown cooling is necessary as far as possible completely eliminate fouling and ash grate heating surface of the upper, the lower portion of the furnace. Then have to adhere to certain natural ventilation flue. Under normal conditions, should be placed to dry moisture-proof agent in the furnace, flue. The dry quicklime as used, the furnace or the flue gas per cubic meter of ordinary should be placed about 3kg. After placing all the ventilation should be tightly closed doors. Lime powder to change after change. Such as boiler rooms in low-lying position, the air during shutdown severe flood tide, the method should be used regularly and placed a small fire to dry dry agent phase separation. If the boiler boiler long time, in order to thoroughly clean the soot topcoat red lead oil furnace or other metal surfaces in the anti-corrosion paint. As for the way home for corrosion inside the furnace shutdown, the shutdown Yaoan the length of time to be. Under normal circumstances, no more than one month shutdown of the available wet home for a month or more should take care of themselves dry. Dry to pay attention when enjoying the following questions: Do not dry agent in direct contact with the metal outer boiler, can be housed in a container such as an iron plate; dry agent after standing, for shutting the hole and the other hand hole cover, the vapor, the water pipe necessary to cut off valve; variant lime powder should be replaced. . Enjoying while wet, to pay attention to boiler water condensate is preferably used, followed by the available existing boiler water, demineralized water again; after adding the base, with a slow fire boiler water is heated to 80 [deg.] C the pressure rose to 100 0.2 when the 0.3MPa to maintain 2-3 hours, alkalinity boiler water circulated reach equilibrium, reduced pressure, then filled boiler water, a certain gauge, and continue to adhere to this pressure throughout the home for, alkalinity should Regular testing, decreases should be added at any time; in winter, wet enjoying pay attention to antifreeze, especially the local sewage channel and economizer; before re-use should release all the pot boiler lye, best prepared sump, in order to facilitate then. At the same time should be rinsed with clean water.

Free Chat

About Us

Contact Us