2T H Fire Tube Boiler In Palm Oil Mill

2T H Fire Tube Boiler In Palm Oil Mill

How fuel (gas) 2t h fire tube boiler in palm mill stack height standards should be implemented as specified?According to requirements "Boiler Air Pollutants Emission Standard" -GB13271-2014 existing files countries, oil, gas boiler chimney of not less than 8 meters, the height of the boiler chimney by specific approval of environmental impact assessment documents OK. When there is a building within a radius of 200m from the new boiler room around the chimney, the chimney should be higher than the tallest building in more than 3m.

Classification is the use of fuel oil-fired 2t h fire tube boiler in palm mill and practical, this boiler is the boiler variety of diesel fuel and waste oil, his overall construction and arrangement of the gas boiler is similar to a common classification of mechanical and steam materialized style.

Boiler burner selection techniques to select the type of burner nozzle atomization or gas burner and furnace 2t h fire tube boiler in palm mill performance according to the structure, which is the most important point. Today we take a closer look. Burner output should match the rated output of the boiler, choose a good shape of the flame, such as length and diameter so as to adapt the furnace structure. The required combustion air is supplied from the root flare fuel gas and air or oil mist uniformly mixed rapidly, to ensure complete combustion. The rated output of the boiler and boiler efficiency is determined, the fuel consumption is calculated, and then selected according to power a single burner arranged to determine the number of burners. Increase the number of burners, in favor of the atomization quality assurance wind oil mix, but too many, and not easy to operation and maintenance, will give burner arrangement difficult. Adjusting the burner to a large extent, be able to adapt to changes in boiler load, to ensure complete stable combustion under different conditions. Fuel atomization less energy consumption, adjusting the wind resistance of the device to be small. Effects of smoke and noise emissions must comply with environmental standards, the main emissions must be below national requirements, should use low-noise and low burner. There are integral and split two ways boiler burner assembly. I.e. monolithic burner body, the burner and a combustion air blower system (including an oil pump, a solenoid valve, a servo motor or the like) into one; split i.e. burner body (comprising a combustion head, oil or gas systems), fans and combustion burner control system (including the control box, fan thermal relay, AC contactor, etc.) are each independent three-part system, according to the specific requirements of the boiler and user choice. We should use a simple structure, reliable operation, easy to adjust and control the repair, easy to implement automatic control of the combustion process in the burner. Respond burner brand, performance, price, and service life of comprehensive comparison. In addition to the burner air pressure to be considered to overcome the resistance of the outer boiler, economizer and also to overcome the resistance of the flue gas system.

To people a good living environment, the Sichuan Provincial Government to respond positively to the national environmental policy, released the latest notice "Sichuan Province to win the Battle of Blue Sky" and other embodiments of nine. Which highlighted: increase Condensing units and cogeneration units technological transformation efforts, speed up the heating pipe grid design. In areas do not have central heating conditions, the existing multiple small coal-fired 2t h fire tube boiler in palm mills, to replace the principle of construction of large-capacity coal-fired boilers in accordance with the same amount. For shutting down key areas of environmental protection, energy consumption, safety and other 300,000 kilowatts coal-fired units of non-compliance.

Scientific and orderly promote clean energy development and utilization of hydropower, natural gas (shale gas), wind power, solar, biomass and so on. As of 2020, the province's hydropower installed capacity reached 79 million kilowatts, the proportion of non-fossil energy consumption reached 37.81%, increase the proportion of natural gas consumption to 16.19%.

The implementation of "Sichuan" Thirteen Five "energy development plan" requirements on coal consumption, increase the intensity of coal washing, coal simultaneous construction of new coal washing facilities, supporting the completion of existing coal mines coal washing facilities in accordance with points Area. Improve coal quality and use of industry standards, do not comply with the provisions of commercial coal quality management and environmental protection requirements of the indicators listed commercial coal. Prohibit the circulation and use of low-grade bulk coal, bulk coal investigated and dealt with according to the law without a license behavior. Increase the civil bulk coal clean governance efforts to promote electricity instead of coal, substitution of gas for coal, to promote the use of clean coal, advanced civilian stoves, strengthen civil bulk coal management. Strengthen regulation and control coal use in autumn and winter. For shutting down key areas of environmental protection, energy, security and other non-compliance of more than 300,000 kilowatts coal-fired units.

Free Chat

About Us

Contact Us