2T Oil Fired Boiler

2T Oil Fired Boiler

0.5 tons gas 2t fired boiler introduced: 0.5 tons of gas boiler Description: 0.5 tons of gas boiler imported burner, automatic programmed control, automatic purge blower, electronic auto-ignition, spontaneous combustion and gas, (air) automatically adjusting the ratio of wind oil good atomization, combustion, low NOX, energy saving and environmental protection. Under normal circumstances, when the boiler steam pressure reaches the set value, the burner combustion is automatically stopped, when the steam pressure is below the set value, the burner is automatically started. When the abnormal phenomenon of the fuel, air intake, fault lights, the output sequencer will immediately stop the fuel, burner shut down automatically.

Reform technology of coal-fired 2t fired boiler combustion mode retrofit of coal-fired boiler by means of this technology, proper pulverized coal can be injected into the proper position of furnace chamber, and appropriate suspended combustion can be added on the basis of furnace row layer combustion, which can achieve a certain energy saving rate. For fuel oil and gas-fired boilers, the old and backward burners can be replaced by new energy-saving burners.

Fuel gas-fired 2t fired boiler installation steps Many users in the purchase of fuel gas-fired boiler fuel gas-fired boiler installation step is not clear, here we introduce to you in detail under the fast sale of shares by Henan side: We all know that the installation of the boiler is in line with national needs promulgated regulations to execute the regulations GB50273-98 "industrial boiler installation engineering construction and acceptance", but we should also note the following in the installation of several points: 1, the first part of the underlying foundation of compacted dust do, then start concreting and tiling, to try to make level, the maximum error of boiler placed inclination of not higher than 5mm, anterior need to open up a sewage tank. 2, the oil pipeline supply line is installed through the boiler plant, a senior technical staff installed a boiler factory is to have a portable installation instructions. 3, the combustor burner installed in the supply line the same as the factory mounted directly on the boiler, so this does not require the installation site 4, piping, valves, meters, accessories mounted fast due Henan local production of fuel gas boiler packaged boiler, so these are also in the factory have been installed, but because these instruments are not precision instruments collision, it will affect its accuracy, it is necessary to gently, the installation process must be careful. More questions about the installation of fuel gas-fired boiler, please contact customer service online!

It provides fast side of 2t fired boiler equipment, installation and commissioning after all normal, we immediately put into use, the hotel did not delay the normal heating. Meanwhile boiler capacity, energy efficient, fully able to meet the needs of heating and bathing water in our hotel rooms. --customer feedback

Free Chat

About Us

Contact Us