5 Tph Heavy Oil Fired Boiler

5 Tph Heavy Oil Fired Boiler

First, the reasons gas 5 tph fired boiler burner ignition misfire bar: 1, the ignition bar gap interposed carbon residue with oil. 2, ignition rods fragmentation. moist. Leakage. 3, the distance between the gas boiler ignition does not stick, too long or short. 4, ignition rods Insulation damage, short to ground. 5, ignition cable and transformer failure: cable, connector damage caused by a short circuit during ignition; transformer break or other fault occurs.

Steam 5 tph fired boiler furnace operating point first launched circulating pump equipment circulating pump outlet, into the furnace, the pressure released, and the system back to the oil pressure, make sure that in the positive practice mode. Circulation pump run for 30 minutes, after the stable operation of the system before it can enter the next step. Open gas pipeline manual valve steam boiler, burner launch button, natural gas burner into the furnace, and then burned, keeping the flame stable condition, is in the safe operation of the equipment. Incineration steam boiler, once the accident shut down if the phenomenon occurs, the device will take the initiative burner interlock protection status, should be promptly cut off natural gas pipeline, launched a purge function of the furnace, the furnace inside air replaced more than clean shutdown. System according to load requirements, temperature requirements and thermal oil outlet, the burner can be actively adjust the size of the amount of fire. Steam boiler heat exchanger is generally divided into two, one is directly touch the touch exchanger, and the other is the direct heat exchanger, which are separate apparatus for flue gas waste heat recovery, energy saving effect complete . Generally steam boiler practices can be simple progress through the transformation of energy-saving action, such as increasing the waste heat recovery equipment installed on, which is energy-saving advantages of steam boilers. Energy savings from the big side, is to promote the cause of saving the country, to say that small ways to create more profits for the company to save costs, the choice of one of the heat exchanger is a good way to complete energy policy.

To the end of October 2020 to complete Chaigai coal-fired 5 tph fired boilers no longer give financial awards complement.

Further, out of the boiler removal methods include eliminated, an alternative centralized heating boiler, coal gas, coal to electricity, use geothermal, wind, solar, biomass with baghouse, clean coal to burn not including , CWS, anthracite, semi-coke, green coke, crude oil, coal-fired boiler removal must be removed chimney or flue physical cutting, it does not have the complex production conditions. Do not use has been shut down, eliminated waste coal-fired boilers to cash rewards and subsidies. In the process of new coal-fired boilers to switch to natural gas to be synchronized to achieve low nitrogen transformation.

Since more than six months since the 5 tph fired boiler equipment, heating and hot water supply well, our technical staff also view real-time remote monitoring and control through the use of the boiler to the scene, Baiyun Quan Lake hotel management staff related to our technical staff gave very great encouragement and affirmation. --customer feedback