5Tph Oil Boiler Price

5Tph Oil Boiler Price

The reason the gas 5tph boiler price burner increased noise analysis when making use of the gas boiler and found this small fire normal, but this time turn the fire, extinguished or flashing instability. First speaking, that is because of this fire damper of the air volume setting is too large; i.e. after an oil fire because the micro-switch valve (damper outermost that group) inappropriate setting (set lower than the fire damper of the air flow larger) burner gas noise increases, mostly because the oil shut-off valve which is closed or lack of oil into the oil filter clogging; or, this is because of low temperature into the oil, the viscosity is too high or the pump into the oil temperature is too high; oil pump failure; fan motor bearing damage; there is because the fan impeller dirty equipment resulting in large noise. The above-described failure when using gas boiler, but also because the viscosity is too high oleaginous easy to be atomized (heavy oil); cyclones and because improper disc and the nozzle pitch; Note that because the fire is worn or dirty nipple; also because this preparatory tank the heating temperature is too high, causing the oil pump oil feed steam does not conform; or because the fuel inside the boiler resulting aqueous oil. When the above-described fault gas boiler used to perform this process, the test should be done gradually decreases; after heating temperature should be; adjusting the distance (between 0 ~ 10mm); clean or replace; is set to about 50 deg.] C to about; or drain oil change.

Since the Shanxi provincial government issued "on the issuance of the People's Government of Shanxi Province, Shanxi Province to win the Battle of Blue Sky's three-year action plan", cities are actively responding to priorities and deployment. Jiexiu municipal government related departments have carried out remediation phase out coal-fired 5tph boiler prices.

Future, Jiexiu City departments should fully understand the situation of air pollution prevention and control of the seriousness and urgency of initiatives to further strengthen the work, work harder to accelerate the phase-out of coal-fired boilers; comprehensive investigation to the use of coal-fired boilers, find out coal-fired boiler unit, boiler type and capacity, device status, etc. and establish a sound accounting boiler, cleaning up coal-fired boiler plant are out of range, so that base clear, the situation is clear, should be eliminated to make sure that eliminated; to clear objectives and tasks , responsible units, measures, in accordance with the time node in an orderly way, and effectively perform their duties, earnestly implement the clean alternative heat sources, the removal of coal-fired boiler with a new energy escorts to carry out work at the same time; to actively coordinate electricity, gas sector, as coal-fired boiler users to implement clean energy transformation provides safeguards to ensure that coal-fired boilers out of the objectives and tasks completed on schedule, and improve urban air quality, and gradually improve the quality of life of the masses.

When long-term disabled 5tph boiler price, furnace should pay great attention to external corrosion and maintenance problems. First, the boiler shutdown cooling, heating surface must be thoroughly cleaned and the fouling of the upper grate, the lower portion of the furnace ash. Then to maintain a certain degree of natural ventilation flue. In general, in order desiccant moisture should be placed in the furnace, flue. The quicklime as a drying agent, within the furnace or flue gas per cubic meter should be placed generally about 3kg. After placing all the ventilation should be tightly closed doors. After the change of lime powder to be replaced. Low-lying position as boiler room, ground during shutdown severe flood tide, often approach should be used and placed a small fire to dry desiccant combination. If the boiler shutdown a long time, after the complete removal of soot coated with an anti-corrosion red lead paint in oil or other metal surface furnace.

The following methods are commonly used to judge the combustion situation of oil-fired gas-fired 5tph boiler prices. Judging from the color of the flame and the color of the smoke, Judge the quality of combustion by the length of the flame.The combustion is judged from the CO2 content and excess air coefficient in flue gas. The combustion adjustment method of the oil-fired boiler is normal combustion, the flame in the furnace is stable and white orange, generally there is a rumbling sound, if the flame beats or has the abnormal sound, should adjust the oil quantity and the air volume in time. If the adjustment still does not improve, the fire should be extinguished to find out the cause, after taking measures to re-ignite.

Free Chat

About Us

Contact Us