60T H Oil Boiler Bangladesh For Building

60T H Oil Boiler Bangladesh For Building

Thirteen Five release plan indicates that China's move towards green development pace firmer, Beijing SASAC Building Materials Service Center from its start, the use of green 60t h boiler bangladesh for building heating for low nitrogen as the primary task before the onset of winter. SAC Building Materials authorities after preliminary investigation and after the screening, the other fast boiler R & D experience in the field of boiler cleaning two decades expressed appreciation can, in August 2017 signed a five Thalia T6 series one boiler and two vacuum with fast Boiler condensing gas boiler products contract.

In order to prevent the occurrence of secondary combustion 60t h boiler bangladesh for building tail, which is a fundamental measure to prevent combustible material deposited in the rear of the boiler. For this reason, when the ignition, if the point does not fire, must immediately stop the supply of the fuel (e.g., coal, oil, gas, etc.) into the furnace, to prevent the combustible matter into the rear of the boiler. In operation, the soot blowing should be strengthened, with the wind appropriate, complete combustion, no black smoke. After the shutdown, monitor the temperature economizer, if the sudden increase in tens of degrees, already causing spontaneous combustion, fire-fighting measures to be taken immediately.

How to prevent running back pass secondary combustion 1, 30% of the rated 60t h boiler bangladesh for building to deal with the amount of purge air before boiler ignition; the boiler must be 30% of rated air flow purge less than 5 minutes after the boiler fire, or allowed to boiler re-ignition. 2, fine-tuning the boiler and combustion systems pulverizing system operating conditions, to prevent incomplete combustion of oil and coal accumulating on the tail heating surface or flue. 3, boiler burning oil, adjust the proper air flow, fuel flow, confirming good gun oil spray, burning completely. If you find a bad oil spray gun should be discontinued immediately, and clean up. 4, when the oil application group administered powder, cast powder should be confirmed before the oil burner ignition good, or allowed to cast powder. 5, the oil powder boiler during cofiring, and check the fuel oil gun system of fire reinforcement. 6, normal operation, operation personnel in monitoring the economizer, an air preheater flue tobacco in different conditions of temperature, abnormal, should be checked to detect a fire-place. 7, air preheater sootblowing steam system normally put into operation, the soot-blowing pressure and temperature in a predetermined range. When the unit load or less prolonged 300MW kerosene mixed combustion, air preheater sootblowing steam to be continuous. 8, the air preheater into a reliable fire alarm device. 9, an air preheater inlet and outlet fume / air damper, and should be able to put an electric shutter can be open, closed tight. 10, if found preheater stall, should be put into operation again immediately, if not turn back, they should be isolated.

The main components of organic heat 60t h boiler bangladesh for building burner natural gas burner 5 is constructed of the following system components: 1, the function that the air supply system, air supply system into the wind speed a certain amount of air to the combustion chamber, the main components are: shell body, fan motors, fan impeller, air guns fire tube, damper controller, damper baffle, a cam adjusting mechanism diffuser plate. 2, the ignition system functions in that the ignition system ignites a mixture of air and fuel, its main components are: the ignition transformer, the ignition electrode, a high voltage electrical cable fire. A more secure electronic ignition system called ignition pulse, is widely used Zhuoyi energy and other natural gas boiler manufacturers. Which facilitate saving, you can simply press a finger, and safe, does not occur due to unexpected accidents occur flame, once the stall state occurs, the control system can close the solenoid valve, off gas passage 3 days , system monitoring function monitoring system is to ensure that the burner safe and stable operation, the main components are flame detectors, pressure monitors, temperature monitors and the like. 4, functions of the fuel system of the fuel system is to ensure that the desired fuel burner. The fuel oil burner system are: tubing and fittings, pumps, solenoid valves, nozzles, heavy oil preheater. Gas burner mainly a filter, pressure regulator, solenoid valve, and then firing solenoid valve, the fuel valve. 5, electronic control system electronic control system command center and the focal the above system, the primary control element is a control box, with different programmer for different burners, the common programmer has: LFL series, the LAL series, LOA series, LGB series, the main difference is the time of each different program steps. The controller 1, ultra Encyclopedia Chinese LCD display, built-in luminous incandescent lamp, regardless of the day night, the screen clearly visible. 2, the image level animation display state, condition, valve status, alarm status, operation of the boiler at a glance. 3, CPU intelligent central processor, all the programs focused on a digital chip, scalability, high degree of automation, simple, and powerful. 4, includes a time setting, temperature setting, setting valve, a continuous setting, timer setting, and other control functions pressure setting, arbitrarily set the working state. 5, includes a low level alarm (anti-dry function), ultra high temperature alarm, alarm and other ultra-high pressure alarm and chain protection (shutdown), eliminate safety hazards. 6, detailed self-diagnosis, record, store alarm information, enables ready access to an alarm condition, easy inspection and maintenance.

Free Chat

About Us

Contact Us