Automatic 2 Ton Condensing Steam Boiler Prices

Automatic 2 Ton Condensing Steam Boiler Prices

Our hotel attaches great importance to environmental protection philosophy, always bear in mind the protection of environmental quality in Xiamen. Therefore, we chose to stay ahead of the fast boiler industry cooperation in clean and green boiler, electric automatic 2 ton condensing steam boiler pricess party fast to ensure that we provide the normal work requirements at the same time, has a very clear environmental performance. --customer feedback

The responsibility of Fangkuai boiler installation project quality manager (1) is responsible for the implementation of technical standards and quality system documents of boiler installation engineering, (2) responsible for organizing and compiling construction organization design, construction plan and other technical documents. 3) responsible for the quality record of the project to meet the prescribed requirements; 4) to lead the work of the professional responsibility personnel of the project and coordinate the cooperative relationship between them, have the right to deal with the disputed quality issues and report to the representative of the quality assurance engineer or manager; 5) implement regulations, norms and standards related to boiler product quality; 6) organize project pot The operation of the furnace installation quality system, coordinate the work of the relevant functional departments and professional responsible personnel of the project quality system, 7) according to the contract requirements, combined with the characteristics of the project, determine the work quality objectives and requirements; 8) grasp the engineering quality information, feedback to the relevant professional responsible engineers in time, constantly improve the work to ensure the quality of the project.

Recommend siting the boiler room and the location of the cell site visit in accordance with the relevant provisions of the above-mentioned gas boiler room design, only the lawn area above the garage of imports in line with site conditions. 1. Since underground garage height is limited, coupled with the explosion vent port without reasonable position, can not meet the specifications of the boiler installation, boiler room should be considered semi-underground structure, i.e., the building height of 2 meters above the top layer in the garage, according to the total height of the boiler room 5 m design. 2. Semi-basement boiler room structure is met by installing the boiler, also addresses the regulatory requirements of explosion-proof explosion venting port, ensure safe and efficient operation of the boiler room. 3. supporting auxiliary boiler, circulation pump house, water treatment facilities have been installed in the negative layer. For abutting against the original return pipe line system. 4. The second heat exchanger unit to be installed in the basement area, respectively.

With the "Internet +" strategy proposed, the Internet technology into the boiler industry. Traditional industrial boiler industry in the use of the Internet, the mobile Internet, cloud computing, big data, networking and other information technologies to optimize R & D and design, production and manufacturing, improve production efficiency and boiler technology, which naturally self-evident. For both boilers, we have to adopt ways to improve their work efficiency and energy saving effect Engineering Center developed the production of an innovative product -? Intelligent module boiler cloud platform, can solve these problems.

Free Chat

About Us

Contact Us