Gas-fired boiler installation Note: Many users in the purchase of gas-fired boiler for the needs of the product itself, faced with the installation of the boiler. According to Xiao Bian experience fast boiler technician for many years at the user site installation of the boiler, summed up the following gas-fired boiler installation considerations, hoping to help your boiler installation go more smoothly. 1, to determine the installation site of the boiler, the boiler units installed must have a certificate installed boiler installation requirements issued by the higher authorities. 2, for registration, in accordance with "Steam Boiler Safety Supervision", the use of boiler units need to check in on each boiler. Boiler units need to have someone in charge of the work, is responsible for the communication with local pot seized, butt all installation procedures. 3, check the boiler and accessories for boiler combustion equipment, auxiliary components to conduct a comprehensive inspection and acceptance, and make a record, if found non-compliant parts in a timely manner to reflect to the boiler manufacturers. 1, boiler, auxiliary equipment, accessory boxes, meter boxes etc. need to be hoisting the specified location, location not be changed. 2, around the mounting location should allow sufficient space to facilitate post simple maintenance, boiler doors and various inspection hole to ensure that open. 3, the boiler room, it is necessary to leave the air inlet, but also with filters and other apparatus, and cleaned, to prevent clogging. 4, the boiler room can not be placed flammable flammable material, highly corrosive gases and volatiles. Third, after the completion of the installation inspection. 1, after the successful landing of boiler installation, you also need to conduct a comprehensive inspection and maintenance work, ensure that the boiler will not flaws in the post-investment runtime.

6, the boiler installation, water pressure test to test for detecting whether the water leakage at the pipe connections.

7, the machine trial run, before starting, gas hot water boiler must be grounded using megger insulation inspection machine model; check no problem, in order to run the boot, and also using a flow table clamp multimeter operating current of the machine voltage and other parameters to be checked.

8, pipe insulation processing, rubber insulation materials may be employed, or for better insulation of glass wool, the outer surface of the aluminum sheet or galvanized steel sheath is fixed.

This is our first collaboration with fast boiler, professional and caring service fast boiler's impressed us. From pre-sales advice to after-sales guidance, every step is very careful and thoughtful. They provide hot water boiler performance is also very good, and effectively improve the level of our heating units. --customer feedback

The pressure hot water boilers into biosteam boilers, the boiler is about the upper body to the atmosphere in the exhaust pipe mounted directly above the steam device, and the control valve is mounted on the exhaust pipe; and some steam in the exhaust pipe after installation of control valves, directly accessible from the boiler water or exothermic water bath, which is very unsafe. If you turned off the boiler control valve operation, in the case of rising pressure, pressure hot water boiler is highly explosive, the consequences could be disastrous.