City Gas Steam Boiler In Portugal

City Gas Steam Boiler In Portugal

Fangkuai Group adopts the concept of “moulding character and creating high-quality products”, and continues to research and continuously improve the technological content of products to get closer to users. With the mission of “creating convenient and fast boiler high-quality products for users”, it uses remote monitoring, APP, and active return visits. And other channels to provide users with convenient and efficient services; with the core values of "professionalism, lean work" as the core value, established an effective enterprise management system, adopted ISO9001 quality management system, OHSA18001 occupational health and safety management system and ISO14001 environmental management System certification; and cultivated a large number of high-quality employees with norms of behavior, professionalism, and continuous commitment to provide customers with more convenient and efficient services.

4 tons of city steam boiler in portugal before firing what needs to be done to prepare a deal boiler conduct a comprehensive inspection before Sheung Shui, the water is softened before boiler water filling. 2, Sheung Shui should check whether there is water leakage valve, leaks should be immediately removed when found. 3, the check Sheung water temperature, pressure gauges, water level, no good production of inlet and outlet valves, smoke profile, said shutter is flexible, the flue gas channel is smooth duct, each cleaning doors are tight. 4, before firing coal with water 8-10%.

Technical characteristics: the overall cost of natural gas boiler is half the coal-fired boilers, and operation costs are four times as coal, a ton of steam needs to burn about 80 cubic meters of natural gas, and coal-fired no more than 0.185 kg, the economic accounts will be considered . Select the gas boiler it under certain conditions choice of last resort. As well as on the performance of the gas is better than coal. In principle, they are heat transfer equipment, the difference is that on combustion, complex grate or coal, coal preparation, etc. as well as coal needs, while gas only burner that simple. Use of cleaning gas boiler: boiler after a long run, the inevitable emergence of scale, mainly due to the scale of the problem of corrosion, formation of boiler feed water with hardness components, through subsequent high temperature and pressure continuously concentrated by evaporation in a furnace a series of physical and chemical reactions that ultimately form a hard heating surface, a dense scale, resulting in reduced heat transfer and the effect of corrosion under the scale factors, will result in reduced boiler waterwall furnace heat absorption, furnace outlet temperature of the boiler is increased, so that increased boiler losses. After scaling while reducing the heat transfer within the water wall, water wall tube wall temperature may lead to increased water wall lead to burst pipes, affect the safe operation of the boiler. The first of scale is detrimental boiler, the boiler is the main cause of accidents, the danger main problems: wasting a lot of fuel: Because only one of very few steel thermal conductivity of scale, so when the heating surface fouling will heat blocked, in order to maintain a certain boiler output, it is necessary to increase the temperature of the side of the fire, so that the external radiation and flue gas heat loss. Now it can be used efficient and environmentally non-corrosive cleaning agent gas boiler cleaning, cleaning Fu World Tektronix cleaning agent scale was completely dissolved, the equipment expose the metal tube primary colors, because the reduction of algae and biological sludge fouling effect. At the same time stripping the role of iron oxide and iron oxide Asia, extended gas boiler service life, reduce energy consumption and improve productivity.

What is the working principle of city steam boiler in portugals, steam boilers, as you know, the main heat source on industrial production, has played an irreplaceable role. Depending on the fuel, coal-fired steam boiler can be divided into steam boilers, biomass steam boiler, gas steam boiler, electric steam boiler, steam boiler fuel and the like. In recent years, our country can be seen from the introduction of environmental management and protection policies, China's degree of attention to the ecological environment. In order to better protect the environment, and to provide people with a better living environment, serious pollution of coal-fired boilers and biomass boilers have been gradually replaced by cleaner and more environmentally friendly gas-fired boiler, the gas boiler has become the mainstream of industrial boiler products. Many users only know enough, I do not know why, small series and everyone works share a gas steam boiler. Today, we talk about the working principle of gas steam boiler, let everyone know more about this type of boiler, that does not hand foot disorder panic purchase. Simply put, gas steam boiler is to achieve chemical energy into heat energy of a carrier. Natural gas, liquefied petroleum gas, fuel gas such as city gas released by combustion heat is transmitted to the water in the boiler, so that the water temperature increases, the output rises to a certain temperature after high-temperature steam, and then fed through the steam pipe production plants, for Production and processing. As this gas steam boiler 4 tons, is provided with a housing inlet, a main steam valve stem, sewage seat, valve stem, the stem and the pressure gauge on the inlet seat economizer, the boiler outlet pipe on the other seat. By interaction over the stem of the gas steam boiler is formed of the following loop: 1, the normal water gas shift cycle: water - softened water tank - the supply pump - the boiler - steam - sub-cylinder - workshop; 2, economizer softening tank water circulation: By circulating pump, an economizer and a water softening tank formed between the reciprocating cycle; 3, the smoke box, economizer condensate normal blowdown boiler water is discharged via the sewage pipe to. Outfall a seat mounted two gas steam boiler drain valve, blowdown, requires two discharge valves are sequentially opened, the sewage.

Free Chat

About Us

Contact Us