Combined 0 5 Ton Gas Boiler Price

Combined 0 5 Ton Gas Boiler Price

What chemical plant combined 0 5 ton boiler price fuel operating costs low chemical plant boiler fuel with low running costs what? For the former chemical plant is run mainly by coal-fired boilers. However, with the further requirement for government departments to environmental policy, now basically it does not take a coal-fired boiler. Operating costs of coal-fired boiler is relatively low under normal circumstances, but for the destruction of the environment is too high. In this regard, leaving the gas boilers and electric boilers, like biomass boilers are not within the scope of this comparison. For comparison of the two fuels boilers, or to divide the region, some areas are suitable for gas, electric boiler is suitable for some areas. If a particular case will depend on local gas prices and electricity prices. In the present situation, there are still more cost effective gas boiler. The Government is also in line with current requirements regarding environmental policy is.

Fuel gas combined 0 5 ton boiler price high degree of automation, higher operating costs than coal, small footprint, requiring less operator; while the gas boiler environmental factor is very high, is the fuel of the future of major equipment recommended.

You must know the combined 0 5 ton boiler price energy problems (induced draft fan power consumption rate, steam consumption) draft fan causes problems 1.1 boiler flue dust and fouling, in particular air preheater fouling, resulting in increased resistance to smoke duct . 1.2 boiler flue, tail heating surface and dust leakage. 1.3 Leakage Rate large air preheater. 1.4 furnace excess air coefficient is too large. 1.5 unit load changes, run the adjustment is not timely, resulting in furnace pressure is too large. 1.6 unit load or low frequent starts and stops. 1.7 coal into the furnace worse, from the design value. 1.8 low efficiency filter. 1.9 draft fan blade badly worn, low operating efficiency. 1.10 fan outlet flue gas desulfurization big resistance. 1.11 soda boiler pipes for leaks. 2, 2.1 to 2.1.1 operational measures to solve the problem of the strict implementation of soot blowing system to prevent the heated area ash, blocking ash, flue gas system to reduce resistance. 2.1.2 holding the induced draft fan, the flue gas separator baffles and dampers in the fully open position. 2.1.3 The experiment showed combustion boiler, proper control of excess air in the furnace. 2.1.4 adjustment chamber negative pressure, air leakage reduction furnace and the flue. 2.2 routine maintenance and testing 2.2.1 induced draft fan performance test to determine the optimum operating point and efficient workspace. 2.2.2 boiler, air preheater, a flue, ESP and other system leakage inspection, process. 2.2.3 timely check processing chassis, shaft seal leakage. 2.3C / D repair, eliminating defects 2.3.1 down strict accordance with movement clearance adjusting fan. 2.3.2 induced draft fan blade defect action elimination hand vane opening adjustment. 2.3.3 Importers and induced draft fan baffle opening check. 2.3.4 duct tightness check process. 2.3.5 wave plate replacement air preheater, rinsed sector plate gap adjustment. 2.3.6 eliminate dust defects and improve collection efficiency. 2.3.7 clean flue gas desulfurization system, flue resistance is reduced. 2.3.8 eliminate soda boiler pipe leakage defects. 2.4A / B repair and transformation 2.4.1 Check and repair the fan blades, replace seriously damaged blades if necessary. 2.4.2 for energy saving fan efficiency below 75%. 2.4.3 The fan motor frequency transformation. 2.4.4 of the precipitator, if necessary, transform and improve collection efficiency.

First Affiliated Hospital of Bengbu fully implement the national environmental protection policies, strict screening of clean combined 0 5 ton boiler price as the supply of medical supplies disinfection and ward heating equipment. Fast boiler with its focus on research and development of clean-type gas boiler two decades of experience in the industry favored. The partnership, to provide fast boiler First Affiliated Hospital of Bengbu Medical College, a WNS20-1.25-YQ one condensing steam boiler, in terms of design, manufacture, installation and other aspects of strict checks to enhance the thermal efficiency of the boiler as well as truly Energy saving and environmental protection.

Free Chat

About Us

Contact Us