Gas Fired Boiler Manufacturer In Venezuela

Gas Fired Boiler Manufacturer In Venezuela

Primary air tube blockage is what causes? How to prevent? Reason: 1) blocked or coked-burner fire nozzle inlet is blocked portion of small oil gun and other debris. 2) too many impurities coal, powder machine speed is too high, the pulverized coal and primary air speed too low. 3) powder machine speed is too high, too much under the powder without timely blown away. 4) a low pressure (throttle open or not to open too small), can not take away meal. Precautions: 1) to the powder and the rotational speed of the unit load and adjust relevant primary pressure according to the powder not more than 700 rpm rotation speed, a wind speed of each holding 25 ~ 30m / s, the mixed primary air temperature was controlled at 180 to 250 ℃, a pressure depending on the load, depending on coal, in the range 2.5 ~ 3.8kPa. 2) find a wind speed is too low, the primary air temperature is lower than the normal value should be to lower the rotation speed corresponding to the normal to the powder of a primary air temperature and wind speed. 3) open, gas steam fired boiler manufacturer in venezuela tank should be fully cut-off torch powder, the powder in the tube is blown accumulated powder. 4) Fire mouth clogged or coked should try to remove. What causes large vibrations induced draft fan? 1) motor bearings in oil, resulting in large vibration and bearing wear; 2) even when the shaft is mounted on the center not good; 3) induced draft fan stall surge; 4) anchor bolt loosening induced draft fan; 5) blade fouling or wear ,lost balance.

A number of factors cause the pressure of the heat efficiency of the fired boiler manufacturer in venezuela module are carrying substantially all parts of the coal gas impressive work, use a large extent, avoided the module boiler fouling contamination, while discharging hazardous gas like nitrogen oxides obtained a clamp. Thermal efficiency is an important measure of the rule module boiler, let us study the cause of a number of factors under the pressure of the thermal efficiency of the boiler module. After inquire about the personnel, boiler heat loss module is mainly produced in the bear on these two: the proportion of full combustion air with smoke emission unreasonable heat loss. Reduce smoke emission install heat loss can be recovered in the flue gas waste heat boiler module terminal fitting, or use more advanced features of FGR boiler. The combustion air fully proportional unreasonable non-compliant analysis: General ejector module boiler burner, causing the air-fuel ratio is no way to maneuver to mobilize. Part of the boiler module using a mechanical blower burner, resulting in unreasonable cause fuel ratio factors are the following: the main air-fuel ratio unreasonable encompass divided into two cases: when oxygen is excessive, the excess will be numerous cold is heated, resulting in increased cost of energy boiler module, the thermal efficiency of the boiler module lowered; when oxygen is non-compliance, will produce incomplete combustion occurs module boiler heat efficiency is lowered.

April 17, Nantong, Jiangsu Province, the municipal government issued the "Nantong City 2019 air pollution control program of work" ( "Program"). "Plan" is mentioned: Nantong City, 153 Taiwan fired boiler manufacturer in venezuela regulation reform, which involves natural gas boilers, biomass boilers, coal-fired boilers; renovation project and will continue to implement ultra-low emission coal-fired units, a total of six thermal power companies more than 10 sets of 75 tons of steam / hour implementation of ultra-low emission coal-fired boilers.

1, the implementation of total coal consumption control. Strict control of the city's total coal consumption, focus more non-power industry scale industrial enterprises in coal consumption, ensure the completion of the province for cut coal task, the city's coal consumption in 2019 than in 2016 to reduce 2.46 million tons. Strictly implement the "Interim Measures for commercial coal quality management," restrictions on the marketing and use of ash ≥16%, sulfur ≥1% of bulk coal. A ban on new coal-fired heating boilers, and strictly control new coal-fired power projects along the Yangtze River in addition to the common back-pressure coal-fired units no new coal-fired power generation, heating project.

2, to promote the integration of thermoelectric project implementation. Coal-fired boiler with a takeover condition within a radius of 15 km of promoting heating above 300,000 kilowatts of large units and small cogeneration units shut down integration. Hoi Mei Ah thermoelectric Ltd. law shut down two coal-fired units totaling 27,000 kilowatts, the letter Qidong Taiwan 12,000 kilowatts coal-fired units.

3, to carry out comprehensive improvement of the boiler. Establish a list of the city's boiler management. Before the end of 2019, 35 tons of steam / h coal-fired boilers and total phase law or clean energy alternative embodiment, suitable in accordance with the electric power, gas and other appropriate gas the regulation principle; promote clean coal utilization, promote clean and efficient coal-fired boiler , 65 tons of steam / h coal-fired boiler and above all ultra-low emissions and complete energy transformation; promote the transformation of low-nitrogen gas boilers, in principle, after the transformation of nitrogen oxide emissions concentration up to 50 mg / m, and in accordance with the corresponding boiler safety requirements. Urban built-up area of ​​ultra-low emission biomass boilers implement reform; the remaining boiler with all the special emission limit requirements. Boiler renovation project completed in 2019 153.

4, to further promote the ultra-low emission coal-fired thermoelectric renovation project. Ultra-low emission coal-fired units continue to implement reconstruction project for six thermoelectric companies 10 75 steam tons / hour and over the implementation of ultra-low emission coal-fired boilers transformation. (Municipal Bureau of ecological environment lead)

5, along actively embodiment desiccant fumes off white coal-fired units. Huaneng Power International, Inc. Nantong Power Plant, Jiangsu Nantong Power Generation Co., Ltd. Nantong Tianshenggang power generators and Nantong Acetate Fiber Co., Ltd., Nan Ya Plastics Co., Ltd. and other companies implement flue gas dehumidification off white works.

6, the implementation of pollution control industrial furnaces special action. City casting, iron alloy, metal smelting and regeneration, glass, ceramics, tiles, refractory materials, lime, waterproof materials, fertilizers, inorganic salts, calcium carbide, etc., according to the melting furnace, the melting furnace, sintering machine (furnace), baking ( calcined) burning furnace, a heating furnace, heat treatment furnace, a drying furnace (kiln), coke oven gas furnace nine types of trades to carry out an intensive investigation. Closely integrated with the second census of pollution sources, establish a management inventory end of June 2019.

WNS4-1.25-YQ fuel gas-fired fired boiler manufacturer in venezuela WNS4-1.25-YQ fuel gas-fired boiler WNS4-1.25-YQ fuel gas-fired boiler can be widely used in hospitals, schools, textile mills, garment factories, supermarkets, garment factories and other units. It is an efficient, low consumption, low pollution of green products. Capacity: 1-130 tons of steam, thermal efficiency: ≥95%, applicable fuel: natural gas, light oil, heavy oil, gas, etc. Application: central heating, public heating WNS4-1.25-YQ fuel gas-fired boiler various technical indicators have reached the world's advanced level, truly clean burning, non-polluting emissions, easy operation, ample output.

Free Chat

About Us

Contact Us