Gas Fired Water Tube Steam Boiler

Gas Fired Water Tube Steam Boiler

Wuhan Port District Social Welfare Institute (apartments for the elderly) is invested by the government pension services, with a total construction area of ​​38,000 square meters, 532 beds, mainly adopt destitute persons, social support on behalf of the elderly. Hope to provide welfare to the elderly year-round 24-hour hot water, the original boiler equipment can not meet this demand, therefore, require additional purchase orphanage hot water boiler. After much investigation, in cooperation with the welfare determined fast boiler, provides three integrally condensing gas hot water boiler (WNS1.4-1.0 / 95/70-Y.Q) by a fast boiler.

Industrial boiler market share rise, to the current trend of energy-saving industry, industrial boilers are mainly used in metallurgy, chemicals, coke, cement, paper, shipbuilding and other industries, mainly through heating boiler, steam production unit each to provide the required or hot water. Different transformation and power industry, industrial boilers since often small cell capacity, installed at the rear end of expensive desulphurization and denitrification apparatus is very uneconomical, so the transformation of coal will be the main alternative route, the coal gas, biomass fuels, cleaning three coal technology route, clean coal will assume the main task. By the end of 2011, the total industrial boilers reach 58.5-60 million units, of which the boiler, the capacity accounted for more than 80% of coal-fired boilers, boiler capacity is less than the number of 35 tons / hour of 96% of the total, while 10 accounting tons / hour up to 80%. Meanwhile, the average thermal efficiency of industrial boilers only 60%, 20-25% lower than in other countries. The country's industrial kilns more than 160,000, concentrated in building materials, metallurgy, chemicals and ceramics and other industries, the annual coal consumption of 300 million tons. The average heating furnace thermal efficiency of only 40%, 10-30% lower than in other countries. A wide range of large industrial boilers in China, the average capacity of small and dominated by coal. Although China's coal-fired industrial boiler design productivity gap compared with foreign small, but the actual operating efficiency of only 65%, 10% -15% lower than the advanced level. Industrial boilers with maximum downstream chemical materials and chemical products manufacturing market size, non-ferrous metal smelting and rolling processing industry, petrochemical industry market size is large, in addition, the market size paper and shipbuilding industries is relatively small, moderate growth in the cement manufacturing industry . Overall, the future of Chinese boiler market demand is still the main metallurgy, chemical and petrochemical three coking industry, and paper, cement and other industries demand is relatively weak, shipbuilding recession has not slowed. Industrial boilers, especially coal-fired industrial boilers for energy saving is important for achieving the overall goal of energy conservation.

Industrial gas boilers small volume itself, and these need not be equipped with auxiliary equipment, simply set up between a host and auxiliary room, set on more messy, covering economy. Industrial gas boiler city gas source is generally taken from the intermediate pressure gas supply line, the gas pipeline laying gas sampling point to the boiler room, then according to quell's brand, type and caliber regulating device applications, scheduling outlet pressure range, by metering the put into use. Establish a set fee just gas network tariffs, pipeline fees, hot walks pipeline fee. Gas pipeline network overall cost of capital is the sum of the gas company funds charged to the user, can be determined depending on the circumstances around the gas company. Usually adopted buried gas pipeline type, buried depth is generally about 0.8m ~ 1.0m, seamless steel pipe can be selected or PE pipes, pipe surrounding sand 15cm ~ 20cm plating, hot water pipe laying relatively simple, somewhat messy steam pipe walks . 3, industrial gas boiler room planning results in the presence of 3.1. Selection of the size of the heat load of the boiler and its expansion tend to choose the boiler capacity, the number of great links. The larger heat load, single boiler capacity should be large. The near future can be greatly increased thermal load, is also relatively large capacity boiler can choose, it will expand the load thought. The only thought to increase the long-term thermal load, the expansion device may leave the boiler placeholder deployment end in the boiler room, or space left on the total FIG. However, in the practice of project planning, often there is a lack of expansion heat load estimates, constitute improper boiler selection, pre-operation to cause unnecessary trouble. 3.2. Gas boiler gas regulator trivial results generally used in high-pressure (less than 5kPa) and medium voltage (5 ~ 150kPa) trivial. Gas usually before entering the boiler room will arrive this requirement. Now the gas hot water boiler is equipped with a high level of automation subsided, a calm requires the gas pressure is lower, so before further demand into a calm pace pressure boiler manufacturers themselves generally equipped. Gas pressure regulating trivial demands reliable equipment, but on the size of the gas pipeline valve is open due to the gas pressure when scheduling the gas pressure is high or low, and tempering will cause off, start and stop frequently subsided's configuration, thereby affecting the boiler work. 3.3. Gas boiler quality results planning standard gauge, the quality can not be ensured when the gas, should be provided or dust, oil and water, respectively, and a total closed drain valve before the gas main pipe before the regulator device. Most of the oil production plant in the use of oil with anger, it is often said of moisture in the summer cold weather, moisture and light hydrocarbons and other substances containing moisture, condensation will constitute a line blockage, an initiative to quell the flame, impact Heating. 3.4. Chimney condensate results because of the high thermal efficiency of industrial gas boiler, a low exhaust gas temperature, typically 180 degrees, the boiler room planning criteria (GB50041-2008) rules industrial gas boiler room chimney should be reinforced concrete or steel chimneys chimney. Chimney will appear directly in the outdoor summer steel chimney condensate freezing results, constitute icing light rusty steel chimney, would constitute a temporary corrosion, freezing severe affect chimney smoke. 3.5. The amount of air to quell the outcome's when quell Industrial gas boiler is in the boiler room, the air between the boiler must be satisfied the requirements apply to quell the device, otherwise there will be no abundant natural gas to quell working carbon monoxide poisoning.

Cause of abnormal gas fired water tube steam boiler stall phenomenon gas steam boiler and treatment of non-normal stalling reason, phenomena and treatment 2013-1-139: 17: 30 to cause a flameout: 1, or the operation of the auxiliary trip power outage. 2, boiler combustion instability. 3, the load is too low, so that the load sharply mill automatic ignition energy loss or failure of combustion. 4, mutant coal, volatile or low calorific value gas. 5, the automatic combustion flame detector failure or failure caused by tripping mill. 6, or blast furnace wall tubes serious improper boiler soot-blowing operation, a large amount of water vapor into the combustion chamber. 7, coal pulverizing system, fuel system failure, resulting in a significant amount of fuel reduction or interruption. Or with a large amount of water in the fuel oil gun blocked too many impurities, low pressure steam or atomized. Second, the phenomenon: 1, a significant increase in furnace pressure, furnace flame monitoring flameless CRT display. See the fire no fire hole, BTG warning window MFT warning lights. 2, the unit load decrease, the steam flow drops rapidly, each segment working medium temperature, the vapor pressure decreases, the value of oxygen surge. Third, the method of treatment: 1, if the MFT tripping protection, should an emergency shutdown processing, stop the supply of fuel. 2, identify the cause flameout, and try to eliminate, to conduct a comprehensive inspection of the boiler, after confirming the device properly, can restart.

Free Chat

About Us

Contact Us