If a single burner extinguishes, there may also be a deviation in the center of the furnace flame, and the air pressure of the extinguished burner may change. If the fuel supply is interrupted, the oil pressure or pressure indication of the extinguished burner may decrease to zero, while the fuel and gas pressure of other operation burners may rise. After the occurrence of the above situation, the natural boiler installation must be handled in a timely manner to ensure the safety of use.

How to avoid the leakage of gas oil furnace and burner Selection Notice: Gas oil furnace, which is a heat transfer oil furnace, and that for us, but also the need to have a comprehensive knowledge and understanding of, because the only way in order to correct and rational use of this kind of natural boiler installation and make their own benefit. So, based on this, then, will explain the boiler-related knowledge, or some answers to common questions, so that we have the learning content, to supplement the expertise in this area. 1. Gas conducting oil furnace burners, which use imported brands, then in the selection, whether to the left margin? Gas conducting oil furnace burners, which use imported brands, then, in the selection of their work is to the left margin, because the only way to run the boiler at full capacity, the actual gas consumption smaller than the standard air consumption. And on this issue, the answer is yes.

2, tightness test

Indoor gas boiler pipes tightness test should be consistent with the following requirements:

① low pressure gas pipe test pressure boiler for planning a pressure not less than 5kPa, under the experimental pressure regulator least 30min, and view all the joint with the blowing agent, no leakage, no pressure gauge pressure drop qualified equipment. When the experimental system stainless steel corrugated hose, plastic composite pipe, oil hose, when the plastic cover brass, IH pressure not less than the experiment, in addition to sealing the respective view point, the end surface of the cladding layer should also whether there is leakage phenomenon View.

② medium pressure gas pipelines boiler pressure test planning more pressure and not less than 0.1Mpa. Under the experimental pressure regulator less than 2h, and view all joints with a blowing agent, no leakage, no pressure drop pressure measurement device qualified.

As a leader in the fast side condensing gas natural boiler installation, in recent years, provide a clean boiler to Beijing multiple office units, was well received. I units through the preliminary investigation and contrast, select fast boiler, it turns out, party fast product does have quite a good cleaning environmental performance, in line with the Beijing municipal government requirements for air pollution emissions, the use of very at ease. --customer feedback