High Efficiency Oil Steam Boiler

High Efficiency Oil Steam Boiler

Gas introduced gas high efficiency steam boiler steam boiler stop sign Profile: natural gas steam boiler is a steam boiler gas, natural gas steam boiler with natural gas as fuel, the combustion in the furnace heat put out by heating the pot water, and allowed to vaporized into steam energy conversion device. Water pan (drum) is continuously released from the combustion of a gaseous fuel energy to heat the furnace temperature is increased and produce steam under pressure. Since the boiling point of water increases with increased pressure, the pot is sealed, the expansion of water vapor generated inside the pressure limited thermodynamic formed, strictly speaking, the steam boiler is heated in water at constant pressure saturated steam drum regasification water formed, is widely used as an energy source. Protection device: (1) protect the boiler water a boiler water level gauge plate supporting one to two, should always be compared with each other, inconsistent findings indicate that shall be corrected immediately. Class water level should be flushed, to determine their true level. While the water level comes electrode rod can accurately capture level signal to an alarm or a pump control. (2) steam pressure protection pressure controller: selection of high sensitivity of the pressure controller, the pressure is high, or low levels of signal to the electrical switches, other control lines or automatic control chain protection. Using pressure controllers and electrical contacts, the vapor pressure can overpressure alarm; single adjustable pressure controller or dual fire burning fire the actual operating pressure. Safety valve: safety valve is the last line of defense to protect the boiler, the boiler pressure exceeds the limit, according to the set pressure relief valve design with the school, the exhaust steam pressure relief, to ensure the normal operation of the boiler. (3) having a burner flame protection flame protection inlet means, combustion function is to detect, when the ignition failure or extinguish combustion middle, immediately off the burner into the oil (gas) solenoid valve, the blower continues to operate at this time, the furnace was purged combustible residual gas, after 20 to 30 seconds purge, and various auxiliary blowers automatically cut off power, the boiler operation stops. (4) self-locking power failure protection case, the boiler shutdown immediately burst self-locking power interruption, if the current power is restored, the boiler will not start at any time, you must reset release self-locking, to re-start the ignition. Editing boiler ignition procedures: 1. Check operation and (or) shift recording. 2, inspection, examination boiler, external. 3, check the main safety accessories. Safety valve, water gauge, pressure gauge, to be tight, reliable and sensitive. 4, check the water treatment equipment. 5, inspection equipment and soda water supply system pipe. Adjust the valves as required to start. 6. Check the oil supply equipment. After the above inspection qualified, you can start the boiler. Note: The boiler is a high-temperature, high-pressure thermal equipment, is one of special equipment, widely used in government agencies, public companies and all walks of life, it is dangerous and special equipment. Event of an accident involving public safety, it will cause huge losses to the state and people's lives and property. For public safety, people's lives and property safety, according to the State Council, "Regulations on Safety Supervision of Special Equipment", the boiler should use full attention the following matters: 1, should be accompanied by safety technical specifications of the factory boiler design documents, product quality certification, safety and the use and maintenance instructions, supervision and inspection certificate (safety supervision, inspection and performance certificate). 2, boiler installation, maintenance, alteration. Engaged in the installation of the boiler, maintenance, renovation of the unit shall obtain special equipment installation and maintenance certificates issued by the Provincial Quality and Technical Supervision, before engaging in the boiler installation, maintenance, alteration. Construction unit before construction will be prepared for installation, maintenance, alteration in writing inform the special equipment safety supervision and management department of the municipality or district, and will start informing sent to the local county level Quality and Technical Supervision for the record, told immediately after construction. 3, inspection of boiler installation, maintenance, transformation. After construction, the construction unit To State Quality and Technical Supervision of Special Equipment Inspection and hydrostatic testing of the boiler installation supervisory inspection declaration. After passing by the State Quality and Technical Supervision, State Special Equipment Inspection, County of Quality and Technical Supervision involved in overall acceptance. 4, registration boiler. After the boiler inspection, the use of units must be in accordance with the "special equipment registration and use of management rules", fill "boiler (census) Registration Form", the State Quality and Technical Supervision to register and obtain a "registration certificate to use special equipment safety . " 5, operation of the boiler. Boiler operation must be performed by trained and qualified to obtain "special equipment operator certificate" certified personnel to operate, must strictly abide by the rules and eight systems, six record. 6, check the boiler. Periodic inspection of boiler once a year, not be used without safety periodic inspection of boilers. Safety accessories safety valve of the boiler regular inspection once a year, pressure gauge biannually verified, may not be used without the periodic inspection of the safety accessories. 7, non-pressure boilers will be installed for the boiler pressure. Do not use water level gauge, safety valve, pressure gauge three safety accessories insufficiency boiler.

According to fuel (electricity, oil, gas), oil-fired gas boiler can be divided into three kinds: electric high efficiency steam boiler, oil-fired steam boiler and gas-fired steam boiler. According to the structure can be divided into vertical steam boilers, horizontal steam boilers, small and medium-sized steam boilers are mostly single, double-return vertical structure, large-scale steam boilers are mostly three-way horizontal structure. The following is the boiler pressure fire shutdown time more than 6 hours, the boiler main steam valve should be closed after a period of pressing fire, opening the superheater outlet header drain valve, to cool the superheater. If the air pressure rises after the main steam valve is closed, it can be used to lower the pressure of the boiler by feeding the water into the boiler and simultaneously discharging the water. Press. When the boiler resumes operation, it needs to go through the pressure rise and protect step 2. There is still steam pressure in the pot during the shutdown period of the pressure fire, so it is still necessary to pay attention to monitoring and make the boiler keep the allowable water level 3, the boiler with cast iron gas saving gas, after the boiler stops feed water, The gas-saving flue baffle shall be closed, the side-hearth baffle opened or used in the circulating pipeline to stop the water temperature in the gas-saving area exceeding the specified value of 4, the proper discharge shall be carried out during the shut-down of the furnace under pressure fire, and the sediment in the furnace shall be excluded. The operation of circulating water pump should not be stopped immediately after the furnace shut down. The circulating water of network should be kept circulating in the system for a period of time, and the water temperature of boiler outlet should be lowered below 50oC. The operation of circulating water pump can not be stopped until the operation of circulating pump is stopped.

The recent good news story: Union Square soon Group was named the provincial Federation of factory affairs leading group as "micro-small and medium private enterprises in Henan workers' congress building demonstration units" honorary title. Win the title, is inseparable from the efforts of all labor union workers, they work with their own solid foundation, effective operational mechanism and splendid achievements successfully nominated and award winning. Over the years, the Labor Union under the correct guidance of urban levels of trade unions, under the correct leadership of the Party, Comrade rely on the staff, smooth internal management channels, good to play the democratic management of conflicts "relief valve" business "stabilizer" and developing the "catalyst".

How to maintain high efficiency steam boiler 1, when maintaining boiler, must cut off the power supply, must release pressure. 2, burners should be removed from boiler body every two months, and other foreign bodies such as carbon deposit and dust should be removed seriously. The photo-electric tube is polished once a month. The fuel filter should always be cleaned and filtered. Carefully clean the inner filter screen of the oil pump and do not destroy the gasket. The burner shall not run without oil to prevent damage to the oil pump. 3, the water level gauge shall be kept clean at all times and rinsed once a day by opening the cleaning valve to ensure the water level is clear. 4. The safety valve shall be pulled once a day in case of rust failure. 5, When the steam boiler stops running for a long time The power supply should be cut off and the maintenance work should be done: (1) dry maintenance, discharging the furnace water after the furnace is stopped, rinsing away the dirt in the furnace, drying the pot with a small burner fire (the burning time should not be too long, so as not to damage the boiler), Then, after all the boiler gas has been discharged, all pipe valves will be closed and checked every three months. (2), wet maintenance shall be applied to boilers with a period not exceeding one month, and the boiler water will be discharged after the shutdown, and the clean and full water will be discharged. Cut off the power supply and close the valve.

Free Chat

About Us

Contact Us